SOHYUNG CHO, Ph.D.
Assistant Professor
281 McArthur Building
Coral Gables, FL 33146
Phone: 305-284-2370
Fax: 305-284-4040
scho@miami.edu
EDUCATION TEACHING RESEARCH PUBLICATIONS EXPERIENCE SERVICE
EDUCATION:
Ph.D., Industrial Engineering, Pennsylvania State University, 2000
M.S., Mechanical Engineering, Seoul National University, Korea
B.S., Mechanical Engineering, Seoul National University, Korea
TEACHING:
· Computer-aided Manufacturing (IEN 406)
· Production and Inventory Control (IEN 465)
· Robotics (IEN 505)
· Design for Manufacturing Systems (IEN 507)
· Automated Assembly (IEN 509)
RESEARCH:
· A unified control system for adaptive manufacturing enterprises
· Scheduling and rescheduling of space shuttle ground processes
· RFID in security and supply chain systems
· Visual servo control system using stereo camera for industrial robots
· Optimization of robotic welding process using support vector machine learning
· Intelligent control of electron beam physical vapor deposition coating process
· Intelligent monitoring system for machine tools using support vector regression
PUBLICATIONS:
· Cho, S., Lewis, S., Prabhu, V., and Fuke, I. (2004), Intelligent automation of electron beam – physical vapor deposition (EB-PVD), Materials and Manufacturing Processes, Accepted for publication.
· Cho, S., Asfour, S., Onar, A., Kaundinya, N. (2004), Tool breakage detection using support vector machine learning in a milling process, International Journal of Machine Tools and Manufacturing, in Press.
· Cho, S. (2003), Distributed Time-Driven Simulation for Modeling, Analysis and Control of Manufacturing Shop-floor, Computers and Industrial Engineering, Submitted.
· Fuke, I., Prabhu, V. V., Cho, S., George, T., Singh, J. (2003), Rapid manufacturing of rhenium components using EB-PVD, Journal of Rapid Prototyping, Accepted for publication.
· Cho, S., and Prabhu, V. V. (2002), A vector space model for variance reduction in single machine scheduling, IIE Transactions, 34, p. 933-952
· Cho, S., and Prabhu, V. V. (2002), Sliding mode dynamics in continuous feedback control for distributed discrete-event scheduling, Automatica, 38(9), p. 1499-1515
· Gougar, H., Cho, S., and Prabhu, V. V. (2002), High performance loading robot design in a tool delivery system, International Journal of Production Research, 40(14), p. 3401-3424
· Cho, S, Lewis S., Prabhu, V. V., and Fuke, I. (2002), Intelligent automation of EB-PVD, Journal of Design and Manufacturing Automation, submitted
· Cho, S. and Prabhu, V. V. (2001), Distributed control of machine capacity and production scheduling, Transactions of NAMRI/SME, Vol. 29, p. 501-508
· Prabhu, V. V., Cho, S., and Koomsap, P. (1999), High performance computing and communication for real-time feedback in distributed manufacturing control systems, CIRP-Journal of Manufacturing Systems, 29(1), p. 79-83
EXPERIENCE:
Academic:
· 2003 – Present, Assistant Professor in Department of Industrial Engineering University of Miami, Coral Gables, Florida
· 2002 – 2003, Visiting Faculty in Department of Industrial Engineering University of Miami, Coral Gables, Florida
· 2001 – 2002, Postdoctoral Scholar in Department of Industrial and Manufacturing Engineering, Pennsylvania State University, PA
· 1997 – 2000, Research Assistant in Department of Industrial and Manufacturing Engineering, Pennsylvania State University, PA
Non-Academic:
· 1994 – 1996, Senior Researcher, Daesung R&D Center, Seoul, Korea
· 1991 – 1994, Research Associate, Daesung R&D Center, Seoul, Korea
SERVICE:
Professional Organizations
· Instituteof Industrial Engineers (IIE)
· Society of Manufacturing Engineering (SME)
· Member of College Council at University of Miami
· Graduate Faculty in Department of Industrial Engineering